Data Centre - Darlington Borough Council

01/06/2011


Responsible for the complete design, installation and commissioning of the fully functional Data Centre. The works comprised: 1. Mechanical Services 2. Ventilation Systems 3. Electrical Services 4. Fire Protection 5. Standby Power 6. Clean Power 7. Computer Support Systems Equipment Comprised of : - 2x400kVA Parallel Redundant (N+1) UPS Systems and Batteries. - Clean Power Supplies to Server Racks and IT/ Comms Equipment. - Essential and Non-essential Power Supplies. - Ultra Quiet 1000kVA Full Containerised Standby Diesel Generator and 12,000 Litre Base Fuel Tank (48 hr at full load). - 3x 230kW Super Quiet D.X. Air-Cooled/Free cooling Chillers (N+1) Serving Data Centre and UPS Plant Room Upflow/Downflow Air Conditioning Systems. - 2x42 kW Air Conditioning Systems (N+1) Serving UPS Plant Room. - 5x62 kW Air Conditioning Systems 9N+1) Serving Data Centre. - Run and Standby Chilled Water Circulating Pumps. - Heavy Grade Chilled Water Pipe Systems, Valves and Ancillaries. - Vapour Sealed Thermal Insulation. - Main Control Panels and Associated Controls. - NOVEC Fire Extinguishing Gas System to Data Centre. - V.E.S.D.A Fire Detection System to Data Centre. - "Cold Isle Containment" System Comprising 32x42U Racks Plus Expansion. - Fresh Air Supply and Gas Extract Ventilation Systems Complete with Smoke Dampers and Controls. - Multi Zone Water Detection System. - Comprehensive Service Package.


"Your tech support with the Air Conditioning equipment out in the USA was much appreciated.."
John McLaren, Amclyde Norson Engineering


Back